Case studies
/
Sola Foods

Peak space locked in by August

Sola Foods
Sola Foods
+22%
Peak capacity
22%
Saved on slow SKUs
3
Seasons running

The challenge

Short shelf life, long lanes.

Sola needed to move small volumes often without paying for half-empty boxes.

Sola Foods

The solution

Weekly LCL with reserved peak space.

Slow-moving SKUs moved to weekly LCL consolidations, and peak space was secured in August.

The result

More capacity, lower cost.

Peak capacity is up 22% and slow-moving SKUs cost 22% less to move, without hurting shelf dates.

Next case study
Line-side delivery for three plants
Halvor Parts